step by step guides

  PARTITIONS
Partitions

Ensure the floor is clean and flat; mark out the line of the partition allowing for the width of the Fermacell boards.

 
  LININGS
Linings

Fix the base track to the floor at 600mm centres using suitable fixings. Isolating strips must be used to ensure the correct Acoustic and Fire performance.

  FLOORS/CEILINGS
Floors/Ceilings

Once the bottom track is fixed, plumb the top track into position and fix with Fermacell screws or proprietary fixings. Fix end studs to the substrates ensuring adequate acoustic insulation at 600mm centres.

 
  WET AREAS
Wet Areas

The intermediate studs should be cut no more than 10mm shorter that the floor to ceiling height and not mechanically fixed. They should be installed facing the same direction.