FLOORS/CEILINGS |
 |
Once the bottom track is fixed, plumb the top track into position and fix with Fermacell screws or proprietary fixings. Fix end studs to the substrates ensuring adequate acoustic insulation at 600mm centres.
|
|
|
| |
WET AREAS |
 |
The intermediate studs should be cut no more than 10mm shorter that the floor to ceiling height and not mechanically fixed. They should be installed facing the same direction.
|
|